Tips for Installing Laminate Floor around Posts

Treat a post in the middle of the floor just like the walls when installing laminate, or for that matter any flooring matterial that is prone to expansion.

Every installation instruction manual that I have read states that you must ensure a minimum of a 1/4 inch gap on all walls when installing flooring. The same goes for ANY obstacle that the flooring will encounter -- like the post in the picture.

This way any expansion will be easily accommodated.


Related Posts:

2 Tips for Installing Laminate floor in Doorways

We are installing a cushion floor in the bathroom so there will be a transition from the laminate floor tot he cushion floor.

Tip 1: For purely cosmetic reasons it is a good idea to finish the laminate about halfway in to the door opening. That way the transition point will be hidden under the door - when it is closed.

Tip 2: Also remember that it is best to install the laminate, or any finish flooring materials, before the door frames go in. That way the gap between the flooring and door opening is hidden by the door frame.

Related Posts:
Reblog this post [with Zemanta]

Installing a Basement Subfloor: another tip

Get yourself a pair of knee pads!

They will be a life safer!

If you are going to be installing a subfloor and/or a finish floor like the laminate we put in, you are going to be on your knees for a good part of the time. That will be hours! I estimate that the subfloor took us over 12 hours to do. It would have been a very painful 12 hours without the knee pads!

I am positive I would not be walking today if it was not for my knee pads...


Related Posts:
9 Tips for Installing Laminate Floor - Monday, January 12, 2009
4 Tips for Installing Basement Sub-Floor - Wednesday, January 28, 2009

;-)

Reblog this post [with Zemanta]

4 Tips for Installing Basement Sub-Floor

Here is your author, hard a work installing the Dricore subfloor panels.

I was installing the panels left to right except for the course you see me working on in this picture. The reason is that I wished to make sure that the panel crossing the threshold of the bathroom door (behind my butt in the picture) was positioned just right.

In order to free up as much floor space as possible we stuffed all the items we were 'storing' in the basement in the bathroom. I intended, and eventually did the next day, to return to complete the subfloor in the bathroom - once the rest of the basement floor was complete and hence had a space to move the contents of the bathroom.

Simple but not Effortless
Installing the Dricore subfloor while a relatively simple process was not without a lot of effort and much more time consuming than I expected. The 2'x2' Dricore panels are tongue and grove but they don't fit with simple placement a light tapping. Plus unless your room(s) are completely square and have only simple 90 degree corners, there will be lots of special measuring and cutting.

6 Tips for Installing the Dricore Subfloor System

1) Get and Use the right tools - You will need:
  • A rubber mallet - avoid using a hammer
  • Create from scrap Dricore panels or purchase a plastic tongue and grove pounding tool
  • Measuring tape and pencil
  • A 4-foot level
  • Crow bar
  • Jig saw
  • Table Saw - a circular saw will work in a pinch but a table saw is much more accurate and FASTER
  • Safety glasses
  • Broom
2) Groves against the wall: Lay the first course of panels starting with the groove side against the wall AND the first panel in the corener should have both grove sides against the wall.


3) 1/4-inch Spacing: Use 1/4-inch material as a spacer between the wall and the panels - on all walls.


4) Use the 'wall' spacers as a Wedge Assistants: Use 1/4-inch material that is at least 6-inches high on the wall where your last piece will end on a course. I found that I could cut the last Dricore panel to fit 1/4" shorter and then pound the panel in piece using the 6" high spacer as both a protector of the wall and as a guide for the panel. Remember to remove the spacer once the subfloor is in and before your install the finish floor as it will be very tight and difficult to get out

5) Measure twice...: and cut once! Cutting panel pieces for the last row and/or around corners can be very tricky. I found that placing the panel in the same orientation as its eventual placement, measuring and that transferring the measuring to the panel made the process much faster and less prone to mistakes. It is better to cut the piece too big than too small...

6) Check for imperfections: I found that some of the difficulty of inserting the tongues into the groves was because of broken or bent tongues. Always do a quick check and remedy imperfections before trying to pound them together.

Related Posts:
Installing a Subfloor in the Basement - Saturday, January 24, 2009

;-)

Installing a Subfloor in the Basement

We started to install the subfloor in the basement last week.

We are using this prefab material from Dricore. This material is a complete solution to covering the basement floor and creating a dry and warm subfloor that is ready to accept finishing.

The Dricore has a built-in vapour barrier and comes in 2 foot x 2 foot 'tiles'. You basically use snap the material together.

Coming Up:
...More Installation tips for Dricore...

;-)
Reblog this post [with Zemanta]

Waiting for Spring...

On Saturday January 3rd we passed the milestone of moving my furniture that was stored in storage at PODS to the Cottage.

We are not yet finished inside but sufficiently finished to accept furniture. This way I save the storage charges, thus freeing up cash to devote to the Cottage.

In the picture you see the garden bench I had in my garden in the front of the Condo I sold in May. ...and as the title suggests I can't wait for spring to enjoy it again!

Coming Up:
As you can see I have been away from the blog for a few weeks. The blog has been a casuality of the Christmas holiday and spending most of the time up at the Cottage doig the final touchs so that we could bring up the furniture.

Over the past three weeks we have accomplished much which I will share with you over the next few posts - possible a week of more of posts - I might even have to do multiple posts per day. We will see what my work schedule allows. We accomplished the following:
  • Installed laminate floor on the main floor
  • Installed vinyl floor in the main bathroom
  • Installed the IKEA kitchen cabinets
  • Installed the bath tub, the toilet and the bathroom vanity and sink.
  • Completed the plumbing for the bathroom in the ceiling of the basement.
  • Started the railing for the stairs downstairs.
  • The taping and plastering of the drywall was completed, and primed.
  • Painted the ceiling and walls of the main floor
  • Installed the refrigerator and stove
  • Installed the microwave oven
  • The electrical was completed including all the baseboard heaters, switches, outlets, and light fixtures (some temporary)
  • Started on the baseboard trim.
In the months of January and February we hope to accomplish the following:
  • Install the baseboard and window trim on the main floor
  • Install the interior doors
  • Complete the hand railings for the stairwell
  • Install the closet doors on the main floor.
  • Install the subfloor in the basement
  • Paint the walls and ceilings in the basement
  • Install the laminate floor in the basement.
  • Finish connecting the plumbing in the basement
  • Connect up the gas supply to the tankless water heater