Showing posts with label Laminate Flooring. Show all posts
Showing posts with label Laminate Flooring. Show all posts

How to Install Tile Like a Pro

It is a fire and building code requirement to install a fireproof barrier under and on any wall behind or beside a woodstove.  The laminate floor we have is NOT such a material.

We installed a slate tile on the floor and on the wall behind the woodstove.  Specifically we used a combination of 6x6 and 6x12-inch tiles, laid in the pattern you see in the picture.

Here are the steps we followed:
  1. Cut out the section of the Laminate floor.  Be sure to make allowance for the space between and around the tiles.  The size of the area needed will depend on your local building code.
  2. Test Layout:  Lay the tiles down and test your pattern - make sure it works for you because it is too late to change your mind once you start.
  3. Make sure the substrate is clean and strong.  Because this section of tile was not going to be subject to traffic we were less worried about the strength.
  4. Towel down a small section of adhesive at a time.  We used the same adhesive as that to be used on the wall.  Normally a thin set motor is used to install tile on floors.  A small bit at a time allowed us to keep within the set time of the adhesive.
  5. Press each tile in to the adhesive and use a level or straight edge to ensure the tiles are all level and flat.
  6. Get and use tile spacers.  This is what will ultimately make your installation look like a pro did it.  One goes at/in each corner of the tile.  Here is a tip...  The pros use the spacers on end rather than in a four star pattern in the corners - that means you use four spacers per corner (see the picture below).  This makes them much easier to remove once the adhesive has set.
  7. Allow enough time for the adhesive to cure - at least a day.
  8. Use the right tools when grouting. You will need a grout float and a sponge.  You use the float to push the group well into all the spaces between the tiles.  You use the wet sponge to remove the extra grout and clean the tile.  This is a two step process.  let the gout set for a bit (read the instructions on the box for the time) and then remove all the excess grout.  Then a bit latter (again read the box) use the sponge again to clean all the remaining group on the tiles, generally avoiding the grout in the spaces.
  9. Allow enough time for the grout to set before sealing the tile and grout.
  10. As a finishing touch we installed a molding at the transition point between the laminate floor and the tile.  This served to cover the space and to act as a debris barrier.
How Much Time ?
Installing tile is not a one day task.  Plan on at least three days.  Our scheudle went something like:
Day 1:  cut and prepare the floor, and install the tile
Day 2: Clean, remove the spacers, and grout
Day 3:  Clean the tile again
Day 4: Apply the sealer
Day 5: Install the transition molding

We followed this process for both the floor tile as well as the tile we installed behind the woodstove (on the wall) so we actually combine a few steps - for instance we did the sealer for both at the same time.  Overall the installation of the tile for both the floor and wall took 6 days.

Related Posts:

;-)

Installing Flooring: Use the Right Tools

Do yourself a favour:  get a rubber mallet.

They are  not very expensive and the mallet will make your DIY project to install under-flooring like in this picture or laminate flooring much faster, more precise, with less damage to the materials (including your fingers, knuckles and hands), and with far less cursing.  My wife will testify to that...

I believe it is worth the purchase even for a single flooring job.  Now that I have one there is always another DIY project where something needs a bit of persuading -- and nothing persuades like a rubber mallet!

Precisely because it is rubber, the mallet does not damage the material you are striking like a normal hammer would.  The rubber tends to give a more satisfyingly hardy 'strike' maybe because the striking surface has more real estate than a hammer.  There will be less glancing blows, less damage, and again less cursing.

My advice:  Get one!

Search Amazon.com for mallet
;-)

X Marks the Spot: Knowing Where the Drain is

In every basement floor, by virtue of most building codes, there must be drain, and the floor must slope towards those drains.  However if you are finishing the floor, as we did with Dricore under-flooring with a laminate flooring finish, then these drains may be covered.

I believe it is important to at least remember where the drains are for future reference.  We have chosen to simply mark or measure and record the position of the drain.

What do think the correct practice should be?
  1. Mark or record the location but keep covered? or
  2. Cut a hole corresponding to the drain and install a low profile drain cover in the floor covering?
Related Links:
DriCore - The Revolutionary Subfloor System - Step-By-Step Installation Video
;-)


Tips for Installing Laminate Floor around Posts

Treat a post in the middle of the floor just like the walls when installing laminate, or for that matter any flooring matterial that is prone to expansion.

Every installation instruction manual that I have read states that you must ensure a minimum of a 1/4 inch gap on all walls when installing flooring. The same goes for ANY obstacle that the flooring will encounter -- like the post in the picture.

This way any expansion will be easily accommodated.


Related Posts:

2 Tips for Installing Laminate floor in Doorways

We are installing a cushion floor in the bathroom so there will be a transition from the laminate floor tot he cushion floor.

Tip 1: For purely cosmetic reasons it is a good idea to finish the laminate about halfway in to the door opening. That way the transition point will be hidden under the door - when it is closed.

Tip 2: Also remember that it is best to install the laminate, or any finish flooring materials, before the door frames go in. That way the gap between the flooring and door opening is hidden by the door frame.

Related Posts:
Reblog this post [with Zemanta]

9 Tips for Installing Laminate Floor

I found an absolutely great deal for laminate flooring from Dale's Home Building Center in Otter Lake. I paid under $1 per square foot, and the stuff was absolutely wonderful to work with.

Attributes of the Laminate Floor:
The flooring was a great quality and has the following attributes:
  • 8.3 mm in thickness
  • resistant to burns, scratching, fading and stains
Easy to install:
This laminate required no glue! In fact the material just snapped together.

Tools Required:
All the tools that I needed were:
  • A hammer, although a rubber mallet would have been better
  • A table saw, although a circular saw would work
Ascetics:
Be sure to lay the planks so that is looks right in the space. Here is a few tips:
  • Lay it so that it length ways as you come into the room. We laid ours so that it was laid in the direction that you entered from the front door.
  • Try to avoid ending at a door but rather run the laminate though the doors to other rooms. It is easier to just run to the door and then put a T-molding to cover the restart of the laminate in the next room - but it just does not look as nice. More work - but a great result!
  • Do the flooring before you install the interior doors - that way the laminate will be under the doors frames - hence no ugly gaps!
  • Be sure to stagger your joints!
9 Installation Tips:
  1. Use a scrap piece of laminate plank to use to hammer (with a mallet) - this avoids damaging the tongue and groves.
  2. Be sure to put 1/4 inch spacers against all the walls to create the required expansion space, AND to protect the walls from the pounding with the mallet.
  3. Always install the laminate in the direction that is easiest. In our case it was left to right. It just just snaps together MUCH easier!
  4. Make sure you create at least a 1/4-inch space around all obstacles like pipes.
  5. Get and use Knee pads!
  6. Make sure the entire floor is clean prior to laying the laminate - scrap and vacuum all bumps - fit any voids
  7. Use a vapour barrier - underlay material. When you lay it do not overlay the material.
  8. Measure twice! You are going to get tired - mistakes happen.
  9. Use the piece you cut at one end as the starting plank on the next run - it often is exactly the right piece to create the right stagger - and your waste will be next to nothing

Coming Up:

Related Posts:

;-)